Power Shutdown in Srinagar for Conductor Augmentation
Power Shutdown
SRINAGAR, JANUARY 07: (JKNN)/ According to the Chief Engineer, Distribution, KPDCL, in order to carry out Augmentation/ thickening of conductor (0.1+0.1) to 0.2 Panther conductor from Pampore Grid to Khadermoh in Phase-I, the shutdown of 33KV Pampore-Pulwama line shall be observed due to which Receiving Stations at Newa, Kakapora, LIS Marvel Stage I, II, III & IV shall remain off while power supply to the Kakapora, Newa, Gadoora, Parigam, Narbal, Ukhoo and Marvel areas will be affected from 10:00 AM to 04:30 PM on 15, 18 and 21 January, 2025.
Meanwhile, all the affected Receiving Stations shall remain charged via 33 KV Lassipora-Pulwama line and load will run as per the availability.
(JKNEWS NATION)
READ ALSO:
Reckless Racing on Srinagar Flyover Sparks Public Outrage WATCH VIDEO CLICK ON LINK https://www.instagram.com/reel/DEkQZm_P5ZP/?igsh=ZWVsdzB3dDEzZHB Srinagar,…
Two JEs Among Three Injured In Mendhar Poonch Road Accident M S Nazki Jammu, January…
’J&K Bank 2025 Calendar Showcases AIMS, Lal Chowk Smart City Clock Tower, Railway, and Scenic…
Major Drug Racket Busted In Srinagar, Two Arrested Along With 8 Kgs Of Heroin: Police…
Fire Breaks Out Near Kashmir University in Hazratbal, Srinagar Fire Incident in Srinagar's Hazratbal Locality…
Minimum Temperatures Recorded Today Kashmir Region: Srinagar = -1.0°CQazigund = -2.4°CPahalgam = -8.2°CKupwara = -2.1°CKokernag…