Categories: Jammu & KashmirTech

Major Power Outages in Srinagar from February 8 to 16,Check Affected Areas and Timings

Major Power Outages in Srinagar from February 8 to 16,Check Affected Areas and Timings

Power Shutdown Alert in Srinagar: Multiple Areas to Face Outages

SRINAGAR, FEBRUARY 06: (JKNN) The Chief Engineer, Kashmir Power Distribution Corporation Limited (KPDCL), has announced scheduled power shutdowns across various areas in Srinagar and adjoining regions to facilitate ongoing development and maintenance works.

Shutdown Schedule:

1. February 08 (10:00 AM – 5:00 PM)

Areas affected: STC BSF Humhama Tapline and STC region

Work: Installation of 33 KV CT/PT operated trivector meter

2. February 08, 12 & 16 (10:00 AM – 5:00 AM)

Areas affected: Receiving Stations at Khanyar, Rainawari, Kathidarwaza, and surrounding localities (Miskeen Bagh Rozabal, Maqdoom Sb, Hazari Bagh, Jogilankar, JLNM Hospital, Kondabal, Hassanabad, Saida Kadal, Dal Kawpora Naidyar, Mental Hospital, Central Jail, Local Dal Area)

Work: Reconductoring of 33 KV Khanyar-Rainawari line

3. February 08, 12 & 16 (10:00 AM – 10:30 AM & 5:00 PM – 5:30 PM)

Areas affected: Receiving Station Takenwari, Sangam, Palpora, Shunglipora

Work: System stabilization and improvement

4. February 09 (11:00 AM – 4:00 PM)

Areas affected: CD Hospital, Lal Chowk, JK Bank, Gupkar, CM Residence, Dalgate, Radio Kashmir

Work: UG cabling near Lalit Palace and installation of 33 KV CT/PT units at R/stn TRC

5. February 11 & 15 (10:00 AM – 4:00 PM)

Areas affected: Receiving Stations at Alasteng, Nagbal, Gadoora, Tulbagh, and feeding areas including Shuhama, Bakura, Darend, Nagbal, Fatehpora, Check, Gadoora, Tulbagh, Chunduna

Work: Stabilization and improvement of the 33 KV line

6. February 16 (10:00 AM – 4:00 PM)

Areas affected: Receiving Stations at Power House, Manigam, Duderhama, and nearby locations (Beehama, Arampora, Baderkund, Nunner, Arch, Manigam, Saloora, Ganderhama)

Work: Maintenance and improvement works

Residents and businesses in these areas are advised to plan accordingly and make necessary arrangements during the scheduled power outages .

READ ALSO:

1,298 Views
JKNN NEWS

Recent Posts

Discover Spinanga Casino – The Ultimate Online Gaming Experience

Table of Contents Discover Spinanga Casino - The Ultimate Online Gaming Experience Unveiling Spinanga Casino's…

2 days ago

Crazy Time Live – Scopri il Gioco di Casinò che Sta Rivoluzionando il Divertimento Online

Table of Contents Crazy Time Live - Scopri il Gioco di Casinò che Sta Rivoluzionando…

2 days ago

Betify Avis – Découvrez Notre Analyse Complète et Avis sur la Plateforme de Paris_5

Table of Contents Betify Avis - Découvrez Notre Analyse Complète et Avis sur la Plateforme…

2 days ago

asdg

asfasfasfasf

4 days ago

asdg

asfasfasfasf

4 days ago

Super Moolah Dolphin Pearl Luxury slot rtp Publication: Victory Highest with Jackpot Slots

ArticlesHow to Winnings the newest Whales Pearl Deluxe SlotWhales Pearl Deluxe Online – Ports Have…

4 days ago