December 22, 2024

KPDCL Announces Unplanned Power Cut Extension in Kashmir: Residents to Endure 2-2.5 Hours Longer During Peak Times”

KPDCL Announces Unplanned Power Cut Extension in Kashmir: Residents to Endure 2-2.5 Hours Longer During Peak Times”

Shall be forced to increase power curtailment by 2-2.5 hours in Kashmir: KPDCL

Says temporary measure due to reduced availability of electricity

Srinagar, Jan 18 (GNS): Kashmir Power Distribution Company Limited (KPDCL) Thursday announced an increase in curtailment by 2 to 2.5 hours across Kashmir Valley during peak hours temporarily.

“This is for the information of the general public that due to a drastic reduction in power generation resulting in reduced availability of power, KPDCL shall be forced to temporarily increase the curtailment by 2 to 2.5 hours across Kashmir Valley during peak hours,” KPDCL said in a post on X, according to GNS.

“The temporary increase shall be reversed as soon as sufficient power is available,” it said, adding, “The inconvenience caused is deeply regretted.” (GNS)

117 Views

Leave a Reply

Your email address will not be published. Required fields are marked *